China Gold Supplier for Led Signage Vendors - Professional Factory Custom Made LED Light Up Marquee Signs LED Bulbs for Wedding Events – PDL Detail:
Specification
1.Use 1 mm thickness galvanized sheet form the 12-20 cm depth frame.
2. Use 1 mm thickness galvanized sheet for the front side
3. Inside is waterproof LED bulbs warranty for 4 years
4. Galvanized sheet、PVC、Aluminum for the back side bottom case
5. Waterproof 12/24V CE approval transformer
6. with 1:1 Installation paper
7. Safe package (bubble inside and strong three-ply wooden case outside)
Note:
1. LED bulbs have many style to choose
2. Galvanized sheet can be replaced by other material such as stainless steel, titanium and PVC etc. Also can paint or plating the color if you need.
3. All the size and the thickness can be customized.
Material | Front: 304# Mirror SS, Galvanized Sheet, PVC |
Side: 304# Mirror SS, Galvanized Sheet, PVC | |
Inside: Waterproof LED Bulbs | |
Back; PVC/aluminum composite /Galvanized sheet | |
Size | Customized design |
Color | Customized from PMS color |
Transformer | Output: 12V and 24V |
Input: 110V-240V | |
Illuminate | Height light with all kinds of color LED bulbs |
Light Source | LED modules/Exposed LED/LED strips |
Warranty | 4 years |
Thickness | Customized design |
Average lifetime | Over 35000hrs |
Certification | CE, RoHs, UL |
Application | Shops/Hospital/Companies/hotels/restaurants/etc. |
MOQ | 1 pcs |
Packaging | Bubble inside and three-ply wooden case outside |
Payment | L/C,TT,PayPal,Western Union,Money Gram,Escrow |
Shipment | By express( DHL,FedEx,TNT,UPS etc.), 3-5days |
By air, 5-7days | |
By ship: 25-35days | |
OEM | Accepted |
Lead time | 3-5 days per set |
Payment Terms | 30% deposit and 70% balance after confirm pictures |
Product detail pictures:
Related Product Guide:
Persisting in "High quality, Prompt Delivery, Aggressive Price", now we have established long-term cooperation with consumers from equally overseas and domestically and get new and old clients' large comments for China Gold Supplier for Led Signage Vendors - Professional Factory Custom Made LED Light Up Marquee Signs LED Bulbs for Wedding Events – PDL, The product will supply to all over the world, such as: Zambia, Poland, Costa Rica, We've been consistently broadening the market within Romania in addition to preparation punching in extra premium quality merchandise connected with printer on t shirt so that you can Romania. Most people firmly believe we've the whole capacity to provide you happy solutions.
Q1: What is the warranty of your products?
A1: The Warranty for acrylic is 5 years; For LED is 4 years; for transformer is 3 years.
Q2: What is working temperature?
A2: Working a wide temperature from -40 °C to 80 °C.
Q3: Can you manufacture custom shapes, designs and letters?
A3:Yes, We can make the shapes, designs, logos and letters that customer need.
Q4:How to get the price for my product?
A4:You can send the details of your design to our email or contact our online trade manager
A4:.All of the above prices are calculated by the widest point; if the length and width exceeds 1meter, then they will be calculated by square meter
Q5: I don’t have the drawing, can you design it for me?
A5: Yes, we can design it for you according to your effect you want it to be
Q6: What is the lead-time for average order? What is the shipping time?
A6: The lead-time for average order is 3-5 days. And 3-5 days by express ; 5-6 days by Air press.;25-35 days by Sea.
Q7: Will the sign suit for the local voltage?
A7: Please rest assure, the transformer will be provided then .
Q8:How do I get my sign installed?
A8: The 1:1 installation paper would be sent with your product.
Q9: What kind of packing you are using?
A9: Bubble inside and three-ply wooden case outside
Q10: My sign will be used in outdoor, are they waterproof?
A10: All the material we used are antirust and led inside the sign are waterproof.
By Hilary from Jamaica - 2018.06.09 12:42
This supplier stick to the principle of "Quality first, Honesty as base", it is absolutely to be trust.
By Kay from Florence - 2017.01.28 19:59